Place deposit

Modern Alpine 2025: Prefab Luxury Redefined

Escape the ordinary. Experience the future of mountain living with the Modern Alpine 2025.

Place deposit

Limited Edition: 10 Units Available

Introducing the Modern Alpine 2025 – the next evolution in mountain modern living. This reimagined design features a dramatic floor-to-ceiling glass gable wall that frames your surroundings like a living masterpiece. The thoughtfully planned interior flows seamlessly from a welcoming entryway to a fully enclosed bedroom, contemporary kitchen, and inviting living space. At its heart, a new code-compliant staircase adds both safety and style. Perfect for hospitality ventures or private retreats, the Modern Alpine 2025 delivers sophisticated space planning and stunning views that bring the outside in.

Design Features

  880 sq ft. (40' Length x 16' Width plus loft)
  Approx. 21' (top of foundation to roof peak)
  Sleeps 4
  Lofted bedroom
  1st floor bedroom
  Full bathroom with soaking tub
  Full kitchen with 4 burner stove
  Large outdoor deck
  Entire 16' wall of glass
  Ample storage space
  Wood or gas stove
  Mini-split for heat & A/C

What's included?

The Complete $125,000* Prefab Package

  • Premium Steel & Closed Cell Foam Panels - Not standard SIPs but superior performance panels that exceed all local insulation codes
  • Fully Engineered & Stamped Plans - Complete documentation of this precision-designed modern alpine home
  • Complete Exterior Window & Door Package - Harmonized to the exact geometry of the building
  • Interior Door Schedule - All interior doors needed for the complete design
  • Loft Floor Framing System - Structural components for the signature alpine loft space
  • Shipping Included - Delivery to any location in the lower 48 United States
  • Panelized Wall & Roofing System - Precision-fabricated to deliver on the stunning renderings, true to form

Your Local Contractor Will Need to Provide:

  • Foundation construction
  • Exterior finishing (metal roofing and siding)
  • Interior wall framing
  • Staircase installation
  • Interior finishing work
  • Mechanical systems
  • Electrical installation
  • Plumbing work

This prefab package is stunning and precision designed, engineered, and fabricated to deliver on the renderings of this building, true to form.

*Taxes and additional fees may apply

How do I order?

  • This secures your place in our production batch of just 10 limited edition units. The initial 5% deposit ($5,000) reserves your Modern Alpine 2025 and demonstrates your commitment to the project. Upon receipt of your deposit, our team will contact you within 48 hours to welcome you to the Modern Alpine family and schedule your initial consultation. Your deposit is fully refundable within 14 days, giving you time to review all materials and confirm your decision.

  • Work with our team to finalize the details of your order, engineer your plans and foundation. During this 4-6 week phase, you'll collaborate with our design specialists to:

    • Finalize site orientation based on your property's views and topography
    • Review and adjust foundation requirements to match your site conditions
    • Address any specific requirements for your build location
    • Receive preliminary permitting guidance for your jurisdiction

    At the conclusion of preconstruction, you'll receive a detailed project packet and the remaining 95% balance will be due to initiate production of your Modern Alpine 2025.

  • Once your final payment is processed, your Modern Alpine 2025 enters our precision fabrication process. Here's what happens next:

    • You'll receive your fully engineered and stamped plans for permitting
    • Your panel package is fabricated in our climate-controlled facility with rigorous quality control
    • Production typically takes 8-10 weeks, with regular progress updates
    • We coordinate shipping logistics for delivery to your site
    • Your panels arrive in clearly marked, weather-protected packaging
    • A comprehensive assembly guide and technical support contacts are included
    • Optional on-site technical advisor available for an additional fee

    Our logistics team will contact you approximately two weeks before your scheduled delivery to confirm your site is ready and to arrange the exact delivery date and time. For remote locations, special delivery arrangements can be made during the preconstruction phase.

    Place deposit

    Let the outdoors in

    Place deposit

    Why DEN's Panel Package?

    • Built in 5-10 Days

      With a small crew and a lightweight crane you can erect your building in just a few days, dramatically reducing construction time and labor costs compared to traditional building methods.

    • Fully Engineered

      You get a stamped set of plans, ready for permitting included with the purchase of the Panel Package. Engineered to be true to the renders, baller.

    • Hyper Insulated

      These are not your grandpa's SIPs—they are steel and closed cell foam and won't degrade or rot. Our advanced panel system provides superior thermal performance and structural integrity that stands the test of time.

    FAQs

    • Production of the Modern Alpine 2025 limited edition begins this spring. Once your final payment is processed, your prefab package will be scheduled for fabrication and delivery. Due to the limited run of only 10 units, we recommend securing your spot in the production queue as soon as possible to ensure timely delivery.

    • The prefab package starts at $125,000. This includes the panelized construction system, engineered plans, windows, doors, and shipping within the continental United States. Additional costs will include site preparation, foundation, interior finishing, and mechanical systems installation by your local contractor. Taxes and additional fees may apply.

    • The panel system can be erected in just 5-10 days with a small crew and lightweight crane. However, total project completion time will depend on your local contractor's schedule for foundation work, interior finishing, and systems installation. Most clients can expect the entire process from foundation to move-in to take 3-6 months.

    • No. The Modern Alpine 2025 comes with fully engineered and stamped plans ready for permitting. These comprehensive documents include all necessary specifications for your local contractor to complete the build according to design.

    • Our panels utilize premium steel and closed cell foam construction rather than traditional structural insulated panels (SIPs). This provides superior thermal performance, structural integrity, and longevity. Unlike standard SIPs, our panels won't degrade or rot over time, and they exceed all local insulation codes.

    • The Modern Alpine 2025 is a precision-engineered design with limited customization options to maintain structural integrity and manufacturing efficiency. Minor interior layout modifications may be possible during the preconstruction phase. For significant customizations, please inquire about our custom design services.

    • The Modern Alpine 2025 can be built on various foundation types, including concrete slab, crawl space, or full basement. Your specific site conditions and local building codes will determine the most suitable foundation type. Detailed foundation specifications are included in the engineered plans.

    • Extremely efficient. Our premium steel and closed cell foam panel system provides superior insulation that exceeds all local building codes. Combined with the mini-split HVAC system and optional wood or gas stove, the Modern Alpine 2025 maintains comfortable temperatures year-round with minimal energy consumption, even in extreme climates.

    • To secure your Modern Alpine 2025, a roughly 5% deposit ($5,000) is required, which secures your place in the production schedule and initiates the preconstruction phase. At the end of the preconstruction phase, 95% of the project balance is due, which initiates fabrication and shipping. You will receive your fully engineered set of plans after this final payment. Financing options may be available through third-party lenders specializing in construction loans.

    • Yes! The Modern Alpine 2025 was designed with both private retreat and hospitality ventures in mind. Its efficient space planning, luxury amenities, and striking design make it ideal for the short-term rental market.

    Still have Questions?